首页 > 代码库 > 关于服务器部署JBOSS报错问题(Deploy of deployment "np-1.0-SNAPSHOT.war" was rolled back with failure mes sage JBAS014750: Operation handler failed to complete)
关于服务器部署JBOSS报错问题(Deploy of deployment "np-1.0-SNAPSHOT.war" was rolled back with failure mes sage JBAS014750: Operation handler failed to complete)
Deploy of deployment "np-1.0-SNAPSHOT.war" was rolled back with failure mes
sage JBAS014750: Operation handler failed to complete
jdk,jboss都部署成功,最后在运行jboss报错。以上是截取部分内容,解决方法如下:
检查Standalone.xml配置
第一个IP Address 和第三IP Address默认是:127.0.0.1
中间IP Address 为服务器IP地址。修改后,JBOSS能启动成功!
关于服务器部署JBOSS报错问题(Deploy of deployment "np-1.0-SNAPSHOT.war" was rolled back with failure mes sage JBAS014750: Operation handler failed to complete)
声明:以上内容来自用户投稿及互联网公开渠道收集整理发布,本网站不拥有所有权,未作人工编辑处理,也不承担相关法律责任,若内容有误或涉及侵权可进行投诉: 投诉/举报 工作人员会在5个工作日内联系你,一经查实,本站将立刻删除涉嫌侵权内容。